"Emmentaler" tunnel

Final steps to finish for the Emmentaler tunnel
In the lower Emmental, this 1.6 kilometre-long tunnel is being built below the River Emme. It is part of the Bahn2000 new construction section that will allow travel from Bern to Zurich. Using automated steering with a
3D-Machine Guidance System of Leica Geosystems, shoulders have now been laid in the biggest “Emmentaler Hole”.

Click to download "Emmentaler" tunnel (PDF, 93.2 KB) (PDF, 93.25 KB)
 
 
  Products
 
3D Systems
GOMACO Slipform Paver 3D TPS Systems (LMGS-S)  leggi
 

 
© Leica Geosystems 2003